The new factory is expected to be completed in May 2025 and go into production in October 2025. The total construction area is 36,000 square meters, including a dormitory area of 8,000 square meters and a factory area of 28,000 square meters
Production Lines
The maximum production capacity of remote controllers is 700K pcs per month. As of now, the actual production capacity is 500K pcs per month, with a utilization rate of 70%.
Fully automatic SMT production lines 7 lines
Semi-automatic assembly lines 16 lines
Fully automated production lines 2 lines Monthly production capacity of remote controller 1M pcs